06 Feb'18

Shlangenz metal hose for the new oil refinery plant Rosneft

Shlangenz metal hose for the new oil refinery plant Rosneft

In a day a new large oil refinery plant, Rosneft, will receive already sent metal hoses.

In a day a new large oil refinery plant, Rosneft, will receive already sent metal hoses.

The new large oil refinery plant Rosneft will receive the hoses produced by Shlangenz.

Negotiations on the supply of products have been started since the announcement of financing the construction of the refinery. In total, the project includes the manufacture of 840 pieces of metal hoses designed to work in the newly built installation of petroleum products hydrocracking.

This project has passed all possible stages of approval by the oil company starting from the request for the design office products to the production and delivery them to the final customer's facility, one of the refineries of the Russian Federation.

Share

Manufacture period

from1
to10days

Standard products

available on stock (in 30% of cases)

from5
to30days

Specific requirements

additional design engineering

Warranty

12month

Standart

For typical service conditions

from20years

Extended

It depends on technical and specific service conditions. The warranty period may be extended (in some cases up to 20 years) upon approval of all technical specifications and service conditions for the product.


Welding shop

connection of end pieces with flexible section

Assembly shop

pre-assembling and production

Testing and quality control department

quality assurance test and documentation preparation

Turning shop

turning of end pieces on CNC-controlled machines

Hydroforming shop

Finished products warehouse

Braiding shop

Projects

We participate in major government projects

Feedback

Send request

We are always happy to answer any of Your questions

* Required fields

Thanks!

Thank you for contacting us. Your application is accepted

Our specialist will contact You within a business day